Horizontal Stab - Final Assembly..
Progress Today:
- Install the Inboard Hinge Bracket Assembly.
 - Installed the Elevator Mounts to the Rear Spar.
 - Install the Front Spar Doubler.
 - Installed the Upper and Lower Spar Caps on the Front Spar.
 - Modified 2 Nose Ribs and 2 HS-1004 Inspar Ribs.
 - Match Drilled the extra hole in the aft flange of the Nose Ribs.
 - Match Drilled the forward flange of the HS-1004 Inspar Rib.
 
This post is from Jeff's RV-14A