Dave's Sling 2

Main gear frame and Rib assembly

Spent a full day working on the main gear and ribs assembly. A few choice words spoken in the direction of the sling designers today but it all ended up ok. This part took a lot longer than expected but it there are a lot of parts and rivets involved

Previous post:
Entry: Fri Apr 17 2026 Entry: Fri Apr 17 2026

This post is from Dave's Sling 2