Jennifer's RV-14

Entry: Fri Sep 15 2023

Finished riveting the crotch strap assemblies then fluted and dimpled the right side outer baggage rib.

Two left side ribs were in my my original kit and one was labeled as being the right side rib and the correct part arrived yesterday.

Previous post:
Entry: Wed Sep 13 2023 Entry: Wed Sep 13 2023

This post is from Jennifer's RV-14