Entry: Sat Aug 15 2026
The last few sessions have been prepping the upper and lower longerons. Trimming, match drilling, and putting the 10 degree twist in the upper longerons.
This post is from Jennifer's RV-14
The last few sessions have been prepping the upper and lower longerons. Trimming, match drilling, and putting the 10 degree twist in the upper longerons.
This post is from Jennifer's RV-14