Horizontal stab completed
Both sides riveted, calling it done. The end caps need close alignment with the elevator, so I’ll build that and the trim tab next, then swing back and do final assembly.
This post is from John's Rans S-21 Outbound
Next post:
Starting the elevator
Starting the elevator