John's Bearhawk Patrol

5/17/2019

First Nose Rib

Decided to do one whole rib start to finish to make sure the process works correctly and the tooling is setup correctly.  

Started with trimming the aluminum to size using a router with a laminate bit and the nose block with flange. Then cut the 

lightening holes out of the form blocks and set up the aluminum with the router for cutting the lightening holes. Finally, I 

deburred the edges (still has plastic wrap on aluminum). Still need to flange edges and lightening holes

Previous post:
5/16/2019 5/16/2019

This post is from John's Bearhawk Patrol

Next post:
5/20/2019 5/20/2019