Mark's Zenith 650B

Entry: Sat Nov 16 2024

Aileron bell crank box install, nose rib realignment and wing level. Nose skin fitting started.

Previous post:
Entry: Tue Nov 12 2024 Entry: Tue Nov 12 2024

This post is from Mark's Zenith 650B