Entry: Fri Aug 29 2025
Rear deck top Ls drilled and added. Top rudder bracket added. Horizontal tail brackets predrilled for install.
This post is from Mark's Zenith 650B
Rear deck top Ls drilled and added. Top rudder bracket added. Horizontal tail brackets predrilled for install.
This post is from Mark's Zenith 650B