Mark's Zenith 650B

Entry: Wed Sep 24 2025

Reassembled and rivet of fuselage. Assembly of cockpit floor with pilot holes.

Previous post:
Entry: Sun Sep 14 2025 Entry: Sun Sep 14 2025

This post is from Mark's Zenith 650B