Mark's Zenith 650B

Entry: Thu Dec 18 2025

centre spar 95 mm flanged hole added. Centre spar final hole size drilled against cabin floor. Wings aligned in preparation for centre spar drilling.

Previous post:
Entry: Mon Dec 15 2025 Entry: Mon Dec 15 2025

This post is from Mark's Zenith 650B