Mark's Zenith 650B

Entry: Sat May 09 2026

Spar shim made for level. Rear spar and brackets installed. Wing level checked. Rear structure supports test fitting but will be drilled later. Side skins test fit and trimmed. Pilot side landing gear bracket fitted and drill. Vertical gear supports fitted.

Previous post:
Entry: Sun Mar 29 2026 Entry: Sun Mar 29 2026

This post is from Mark's Zenith 650B