Horizontal Stab - Chapter 8 page 3 and 4 - Forward Spar
Spar Caps ... a ton of drilling.
Today’s Progress:
- Completed the Spar Cap and Stringer Trimming and deburring.
 - Completed the Deburring of the Forward Spar.
 - Clamped the Forward Spar Cap to the inner flange corner 28 holes in on each side.
 - Match drilled all of the #30 holes through the web into the cap. Then disassembled and demurred again... The reassembled and did all the #40 holes.... Then disassembled again a d debuted some more.
 - Repeated step 4 for the lower spar cap..
 - installed the Forward spar doubler and Final drilled all the #30 holes. Disassembled and debuted the Doubler.
 
This post is from Jeff's RV-14A