Brendon's RV-10

Fuse Dec 26 2024

Fuselage Section 32

Confirmed that there was no tailcone twist after completing the reassembly as called out in section 10. Completed the first half of section 32 today on the tailcone attach. Was also able to install one of the floor pans on the pilots side. After some finagling, we were able to fit the tailcone to the fuselage. We determined that it is much easier if you have a second person and start with the tailcone offset ~10 degrees to the right side and start with one side and bring in the other side as the other person lifts the skins and tabs and to make sure it's all coming together correctly. Completed the appropriate match drilling of the spars, and other components. tomorrow will be disassembly, deburring, and reassembly and riveting.

Previous post:
Tail Dec 24 2024 Tail Dec 24 2024

This post is from Brendon's RV-10

Next post:
Fuse Dec 27 2024 Fuse Dec 27 2024