Fuselage Section 29
Completed the remaining sections to be riveted in section 29. This included some of the ribs that mate with the side skins, installed the co-pilots floor pan, the final ribs to be installed and riveted in after the floor pans are installed. Still have a few pop rivets to complete due to tight quarters on the floor pan. Have 4 remaining rivets that i need to remove some bolts in the main bulkhead spar assembly to be able to rivet those final rivets. Currently unable to get a bucking bar into the tight spaces.