Brendon's RV-10

Fuse Feb 2 2025

Fuse Section 39

Worked with Rachel today on the two shorter torque tubes for the elevator control assembly. Riveted together the tubes and threaded end caps and installed the threaded rod ends. Also got to do the first safety wire on the plane per the callout in the drawing.

Previous post:
Fuse Feb 1 2025 Fuse Feb 1 2025

This post is from Brendon's RV-10