Brendon's RV-10

Fuse Mar 23 2025

Cabin Top Work

Further Cabin top refinement and sanding. Should only need one more day of sanding to get the bottom of the cabin top to sit correctly with the alignment with the skin along the rear section.

Previous post:
Fuse Mar 8 2025 Fuse Mar 8 2025

This post is from Brendon's RV-10

Next post:
Fuse Mar 29 2025 Fuse Mar 29 2025