Brendon's RV-10

Fuse May 18 2025

Cabin Top Match Drilling

Match drilled and countersunk the holes in the door opening that mate the cabin top to the fuselage.

Also created the layout diagram for the avionics in the plane. Even made the ribbon lengths running to the wing roots, and also the tailcone and equipment behind the baggage bulkhead.

Previous post:
Fuse May 17 2025 Fuse May 17 2025

This post is from Brendon's RV-10

Next post:
Fuse May 21 2025 Fuse May 21 2025