Brendon's RV-10

VS Feb 21 2026

Made some good progress on the VS (Take 2). Cut the spar caps, and got all the #40 and #30 holes drilled into both spar caps from the main spar.

Previous post:
Elevator Feb 20 2026 Elevator Feb 20 2026

This post is from Brendon's RV-10