VS Feb 21 2026
Made some good progress on the VS (Take 2). Cut the spar caps, and got all the #40 and #30 holes drilled into both spar caps from the main spar.
This post is from Brendon's RV-10
Made some good progress on the VS (Take 2). Cut the spar caps, and got all the #40 and #30 holes drilled into both spar caps from the main spar.
This post is from Brendon's RV-10