David's RV-14

Entry: Wed Apr 09 2025

Page 23-05 step 3 to 23-06 step 4. Fitted and primed toque tubes. Waited to dry overnight.

Previous post:
Entry: Tue Apr 08 2025 Entry: Tue Apr 08 2025

This post is from David's RV-14