Entry: Wed Sep 10 2025
Continued working on Section 28 along with OP-62 for Thunderbolt option. Experienced a LOT of difficulty trying to get the firewall sides to wrap around and line up with the holes on the muffler ramp. Also encountered significant interference between the firewall center and the sides. Had to file down the sides but this caused other fitment issues (gaps). Not really happy with the way it turned out but the tank sealant seems to do a good job of blending everything together.
Previous post:
Entry: Mon Sep 08 2025
Entry: Mon Sep 08 2025
This post is from David's RV-14