Entry: Thu Oct 02 2025
Spent the day working on page 29-08, installing the left and right skins (temporary) and match drilling the lower cowling hinge pieces.
This post is from David's RV-14
Spent the day working on page 29-08, installing the left and right skins (temporary) and match drilling the lower cowling hinge pieces.
This post is from David's RV-14