David's RV-14

Entry: Thu Oct 23 2025

Catch-up post covering the past two weeks. Managed to install the JDAir Latch. Primed the parts for install. Installed the CR rivets for the lower gear drags. Started painting the side skin with PPG but encountered numerous pin holes (solvent pop?). Paused painting to troubleshoot.

Previous post:
Entry: Sun Oct 05 2025 Entry: Sun Oct 05 2025

This post is from David's RV-14