Entry: Tue Apr 21 2026
Finished installing the elevator control tubes, canopy release mechanism, and control sticks. Began Section 37 by picking and preparing parts (debur, clean up edges, etc).
This post is from David's RV-14
Finished installing the elevator control tubes, canopy release mechanism, and control sticks. Began Section 37 by picking and preparing parts (debur, clean up edges, etc).
This post is from David's RV-14