Build times: Sling Aircraft Sling TSi

Gary's Sling TSi

Total Build Time
692.2 hours

Avionics

Build time: 4.3 hours

in progress
5%

Firewall forward

Build time: 15.3 hours

in progress
15%

Engine

Build time: -

not started
0%

Fuselage

Build time: 325.8 hours

in progress
80%

Miscellaneous

Build time: 28.9 hours

in progress
5%

Canopy

Build time: 28.9 hours

in progress
75%

Electrical

Build time: -

in progress
5%

Painting

Build time: -

not started
0%

Upholstery

Build time: -

in progress
50%

Tail

Build time: 103.1 hours

complete
100%

Elevator

Build time: 17.4 hours

complete
100%

Horizontal stabilizer

Build time: 18.7 hours

complete
100%

Rudder

Build time: 25.6 hours

complete
100%

Vertical stabilizer

Build time: 41.4 hours

complete
100%

Wings

Build time: 214.8 hours

complete
100%

Ailerons

Build time: 11.1 hours

complete
100%

Flaps

Build time: 61.5 hours

complete
100%

Main wing

Build time: 139.3 hours

complete
100%

Section build times

Section Status Time
(hrs)
Progress
Avionics in progress 4.3
5%
Firewall forward in progress 15.3
15%
Engine not started - -
Fuselage in progress 325.8
80%
Miscellaneous in progress 28.9
5%
Canopy in progress 28.9
75%
Electrical in progress -
5%
Painting not started - -
Upholstery in progress -
50%
Tail complete 103.1
100%
Elevator complete 17.4
100%
Horizontal stabilizer complete 18.7
100%
Rudder complete 25.6
100%
Vertical stabilizer complete 41.4
100%
Wings complete 214.8
100%
Ailerons complete 11.1
100%
Flaps complete 61.5
100%
Main wing complete 139.3
100%
* If a parent section's time is greater than the sum of its sub-sections, it simply means one or more posts weren't categorized under a sub-section.

Build times by tag

Tag Build time (hrs)
wiring 21.5
avionics 5.2
Priming 108.6
Landing Lights 1
storage 5.2
Match Drilling 30.8
Rough Assembly 9.9
Deburring 140.8
Installation 35.7
Dimpling 37.2
Control assembly 3.3
Flaps, Ailerons, Wing and Aileron Tips 11.8
Wing Fuel Tanks 13.3
Fuel Lines and Valve Installation 9.8
Trim tab 0.3
Aerial 15.4
Fabrication of parts 7.1
Cleaning 65.9
Inventory of parts 22.3
Center Fuselage 3.3
pitot 1.3
Electronics 4.5
Air 2.3
Heater 4.2
Shipping 0.8
Drilling 14.7
Countersinking 14.5
Riveting 267.9
Torquing 4.7
Painting 7.8
Tail strobe 1.5
Rudder Tip 0.6
Earth Strap 0.6
Jigs 3.5
Scuffing 7.6
Alignment 8.8
Sanding 25.3
Flight Controls 10.3
Fuel Line 6.3
Door handle assembly 16.5
Door latch assembly 16.5
Removing protective plastic covering 1.3
Grinding 3.8
Fiberglass work 8.6
De-riveting 8.1
autopilot actuator install 4.3
Rear Fuselage 2.3
Insulation 22.3
Rivnuts 6
Paint stripper 2.5
Measuring 7.7
Assembly 22.4
Shaping 2.4
Modification of parts 5.3
HVAC 7.1
Epoxy 3.4
Manufacture 22.1
Rivet 25.4
Seal 5.3
Inspection 1
Wheel pants 8.4

Build times by week