Brake bleeding, electrical and started cowling

Fitted power line and bus bar from VPX to circuit breakers

Trimmed fuel line between Midwest Panel Builders pressure sensor and gascolator then reinstalled

Completed firewall forward wiring, tidied and secured

Fitted main fuel pressure sensor (Garmin 75G unit instead of the factory standard unit) and completed fuel hoses, then blew compressed air through the hoses and out the sides of the fuselage where they will connect to the wings to ensure they were free of debris

Cleaned intercooler with compressed air

Bled the brakes using a 350ml syringe and Shell Fluid 41. Syringe not recommended, very difficult to use

Covered air filter box with heat reflecting ThermoTech on advice from another builder

Commenced cowling fitment