Total Build Time
932.5 hoursAvionics
Build time: -
          in progress
        
        
          0%
        
    Firewall forward
Build time: 238.5 hours
          in progress
        
        
          0%
        
    Engine
Build time: 41 hours
          in progress
        
        
          0%
        
    Fuselage
Build time: 456.5 hours
          in progress
        
        
          75%
        
    Miscellaneous
Build time: 166 hours
          in progress
        
        
          0%
        
    Canopy
Build time: 166 hours
          in progress
        
        
          0%
        
    Electrical
Build time: -
          not started
        
        
          0%
        
    Painting
Build time: -
          not started
        
        
          0%
        
    Upholstery
Build time: -
          not started
        
        
          0%
        
    Tail
Build time: 10 hours
          in progress
        
        
          0%
        
    Elevator
Build time: -
          not started
        
        
          0%
        
    Horizontal stabilizer
Build time: -
          in progress
        
        
          0%
        
    Rudder
Build time: -
          not started
        
        
          0%
        
    Vertical stabilizer
Build time: -
          not started
        
        
          0%
        
    Wings
Build time: 61.5 hours
          not started
        
        
          0%
        
    Ailerons
Build time: -
          not started
        
        
          0%
        
    Flaps
Build time: -
          not started
        
        
          0%
        
    Main wing
Build time: 58.5 hours
          not started
        
        
          0%
        
    Section build times
| Section | Status | Time (hrs)  | 
              Progress | 
|---|---|---|---|
| Avionics | in progress | - | - | 
| Firewall forward | in progress | 238.5 | - | 
| Engine | in progress | 41 | - | 
| Fuselage | in progress | 456.5 |    
    75%
     
 | 
                
| Miscellaneous | in progress | 166 | - | 
| Canopy | in progress | 166 | - | 
| Electrical | not started | - | - | 
| Painting | not started | - | - | 
| Upholstery | not started | - | - | 
| Tail | in progress | 10 | - | 
| Elevator | not started | - | - | 
| Horizontal stabilizer | in progress | - | - | 
| Rudder | not started | - | - | 
| Vertical stabilizer | not started | - | - | 
| Wings | not started | 61.5 | - | 
| Ailerons | not started | - | - | 
| Flaps | not started | - | - | 
| Main wing | not started | 58.5 | - | 
Build times by tag
| Tag | Build time (hrs) | 
|---|---|
| Wing | 26 | 
| Fuselage | 10.5 | 
| engine | 14 | 
| canopy | 16.5 | 
| Research | 58 | 
| Doors | 26 | 
| Seats | 8 | 
| Windscreen and Canopy | 16 | 
| Window | 21 | 
| Cleaning | 7.5 | 
| windows | 3 | 
| Central brace | 6 | 
| back seats | 8 | 
| MD-RA | 3 | 
| Shipping | 58 | 
| Riveting | 20 | 
| Sanding | 8 | 
| Tailcone | 10 | 
| Door handle assembly | 58 | 
| Door latch assembly | 31 | 
| Grinding | 15.5 | 
| Door strut | 26 | 
| door | 16 | 
| Front landing gear | 13 | 
| Engine mount | 13 | 
| practicing | 8 | 
| fiberglass repair | 4 | 
| bond fix | 4 | 
| preparation | 13 | 
| autopilot actuator install | 13 | 
| door fiberglass fix | 19 | 
| Wing damage fix | 5 | 
| BRS Parachute | 141 | 
| BRS | 34 | 
| Engine systems | 5 | 
| cowling | 154.5 | 
| Air box | 9 | 
| fuel line fittings | 5 | 
| fuel injectors | 5 | 
| fuel lines | 4 | 
| oil lines | 4 | 
| Camlocks | 86 | 
| Door assembly | 7 | 
| Add-on flush patch | 0.5 | 
| Add-on wing access panels | 24 | 
| Add-on wing conduits | 8 |