Baggage Door Installation and Fit Adjustment
Attached baggage door to fuselage and applied filler for fitment. Sanded and adjusted surfaces to achieve proper alignment and smooth integration with the fuselage.
Previous post:
RV-10 Empennage and Preparation Work (Guy – Apr 13–17)
RV-10 Empennage and Preparation Work (Guy – Apr 13–17)
This post is from Sumit's RV-10