Brendon's RV-10

Fuse Jan 20 2025

Flap Actuation, Section 40

Started on section 40, the flap actuation assembly! Still had Kiley here so wanted to get some match drilling done while he was here. The workbench is long enough to be able to connect both the left and right sides of the flap actuation assembly and do both sides in sequence together. We were able to complete the match drilling of the flap horns to the flap torque tubes, as well as the flap crank to the torque tubes. Still have the inboard holes in the flap horns to match drill and then on to deburr and prep before final assembly. Should be able to knock that out during the next build session.