Brendon's RV-10

Fuse Jan 31 2025

Fuse Section 38

Touched up the rudder pedals where the powder coat cracked when the rivets were squeezed together with some matte black spray paint. Also utilizing the steel rod method as outlined at the bottom of this page: https://rv10.org/index.php?title=Brakes_/_Wheels

Cut the steel rods to length, loosely installed the rudder pedals and brake lines per the installation instructions from Aircraft Specialty Flight lines (Who i bought the brake lines through)

Sprayed some of the components for the aileron control rods and elevator push rods.

It is amazing how long some of this assembly work takes

Previous post:
Fuse Jan 30 2025 Fuse Jan 30 2025

This post is from Brendon's RV-10

Next post:
Fuse Feb 1 2025 Fuse Feb 1 2025