Entry: Mon Sep 29 2025
Joined the two fuselage halves together, Section 29. Also primed the lower gear braces. Missing 2x AN5-41A bolts. Checking with Johnstons Aircraft to see if they have some. Also checking with TS Flightlines to see about enlarging a few bulkhead holes for the Berhinger brakes. Also added protective vinyl to cockpit floor.
This post is from David's RV-14
Next post:
Entry: Mon Sep 29 2025
Entry: Mon Sep 29 2025