David's RV-14

Entry: Mon Sep 29 2025

Joined the two fuselage halves together, Section 29. Also primed the lower gear braces. Missing 2x AN5-41A bolts. Checking with Johnstons Aircraft to see if they have some. Also checking with TS Flightlines to see about enlarging a few bulkhead holes for the Berhinger brakes. Also added protective vinyl to cockpit floor.

Previous post:
Entry: Sat Sep 27 2025 Entry: Sat Sep 27 2025

This post is from David's RV-14