David's RV-14

Entry: Mon Sep 29 2025

Continued work on Chapter 29 by installing the leg braces and tightening the bolts to match drill the center section upper and lower drag braces.

Previous post:
Entry: Mon Sep 29 2025 Entry: Mon Sep 29 2025

This post is from David's RV-14